The £6billion Thames Tideway Tunnel, is a colossal project.  Working alongside Actiform, Precise were chosen to provide electrical services on the modular buildings which would create the welfare facilities at the Greenwich Thames Water site.

Precise pre-cabled the modular buildings with electrical services within the factory complex in Yorkshire.  Once the building were in-situ at the site in Greenwich, the Precise engineers completed and connected the electrical services.

Working to prescribed methods and specific timescales are paramount in a project such as this, where the integration of other disciplines and scopes of work are taking place simultaneously.  All the operatives on site were scrutinised and undertook strict inductions for Health & Safety and on-site behavioural science.

Precise integrated perfectly within our manufacturing facility and on site, to deliver the electrical installation on this prestigious contract. Once again delivered to a very high standard, on time and budget.

Corin – Contract Manager, Actiform

 