ADS Charity Head Office
Precise has worked and continues to work at the head office of this Manchester-based alcohol and drugs charity, installing interactive display screens, upgrading the network cabling, EICR certification works...
Read MoreCarlsberg UK
Operating within the colossal warehouses of this multinational brewing company, Precise carried out the installation of data points at high level. Health and Safety, along with highly trained engineers...
Read MoreHuddersfield Town Hall
The magnificent Huddersfield Town Hall is also one of the buildings Precise engineers can boast to have worked in; inspecting the networking cabling and telephone systems. Operating within...
Read MoreKirklees Public Buildings WAP replacement rollout
This planned work across the borough was carried out in within a tight timescale and needed to coincide with the librarians and volunteer staff working hours.
Read MorePortakabin – New Structured Backbone
Working across the site in a variety of locations – including large industrial manufacturing facilities, canteen, production lines, offices – Precise installed a new fibre optic backbone in excess of 10km and...
Read MoreSellafield – Data Installation
With experience of previously working at other nuclear facilities and power stations, Precise were perfectly positioned to be a responsible and responsive contractor for the data installation required at this high profile...
Read MoreThames Tideway Tunnel
Precise pre-cabled the modular buildings with electrical services within the factory complex in Yorkshire. Once the building were in-situ at the site in Greenwich, the Precise engineers completed and...
Read MorePost Flood Emergency Electrical Work
Rochdale Metropolitian Council, like many organisations suffered damage during these flash floods. The Council’s flagship Head Offices, Number One Riverside, were among the many buildings damaged. Like most businesses,...
Read MoreBoarshaw School – Fire Alarm System
Working to a tight budget and deadline during the school’s six-week summer holidays, Precise installed the new fire alarm system within the entire 2-storey school building; overcoming barriers and...
Read More